TCEQ Wastewater C Practice Test

Practice on our own questions, most written straight from the Texas rules a Class C operator works under.

A Category B plant runs in shifts. What is the lowest license the operator in charge of a shift may hold?
More options

Unofficial practice questions, not affiliated with the Texas Commission on Environmental Quality. Checked November 27, 2026.

The real exam, as TCEQ describes it

To pass
70% right
Time limit
180 minutes
Fee
$111 license application fee to TCEQ. Testing centers set their own fee.
Languages
English and Spanish
Subject categories
20, from Statutes and Rules and Permits to Disinfection, Biosolids Disposal and Math Problems.
How it is given
On a computer at an approved testing center, closed book. A non-programmable calculator and scratch paper are allowed. The score comes right away.

Checked October 16, 2026 against TCEQ's need-to-know criteria, wastewater licensing and exam pages, and 30 Texas Administrative Code 30.20. Rules change, so confirm with the agency itself before your test.

TCEQ's need-to-know criteria for wastewater operators

All 126 questions with answers

Statutes and Rules

  • A Category B plant runs in shifts. What is the lowest license the operator in charge of a shift may hold? Answer: Class C. 30 Texas Administrative Code 30.350(k), Classification of Wastewater Treatment Facilities, Wastewater Collection Systems, and Licenses Required
  • A license expired 45 days ago and no renewal application was sent. What must the operator do to be licensed again? Answer: Apply anew, meet current requirements and pass the exam. 30 Texas Administrative Code 30.24(g), License and Registration Applications for Renewal
  • A wastewater license is valid for three years. How many hours of approved continuing education does its renewal take? Answer: 30 hours. 30 Texas Administrative Code 30.342(a), Qualifications for License Renewal
Show all 126 questions

Statutes and Rules, continued

  • An activated sludge plant that is not extended aeration is permitted for a daily average flow of 0.5 MGD. What is the lowest license its chief operator may hold? Answer: Class C. TCEQ, License Level Required for Domestic Wastewater Facilities (the table of 30 Texas Administrative Code 30.350(e))
  • An applicant keeps failing the same TCEQ exam. After how many failures does the application expire, if 365 days have not passed first? Answer: Four. 30 Texas Administrative Code 30.20(d), Examinations
  • At least how many days a week must a plant be operated by its chief operator or by an operator who holds the required level of license? Answer: Five. 30 Texas Administrative Code 30.350(j), Classification of Wastewater Treatment Facilities, Wastewater Collection Systems, and Licenses Required
  • For how long may a person who is new to wastewater treatment work as an operator-in-training? Answer: Up to one year. 30 Texas Administrative Code 30.350(c), Classification of Wastewater Treatment Facilities, Wastewater Collection Systems, and Licenses Required
  • How many extra hours of approved training stand in for six months of the required work experience? Answer: 20 hours. 30 Texas Administrative Code 30.340(e), Qualifications for Initial License
  • How much work experience does TCEQ list for a Class C wastewater treatment license, before any substitution? Answer: Two years. TCEQ, Occupational Licenses: Wastewater Treatment Plant and Collection System Operators, Wastewater Class C Licensing Requirements
  • Under the Texas Water Code, who must hold a license at a sewage treatment facility? Answer: A person who performs process control activities. Texas Water Code 26.0301(c), Wastewater Operations Company Registration and Operator Licensing
  • What may the holder of a wastewater treatment facility operator license also do without a second license? Answer: Work on wastewater collection systems. 30 Texas Administrative Code 30.350(m), Classification of Wastewater Treatment Facilities, Wastewater Collection Systems, and Licenses Required
  • Which change moves a Category D plant up to Category C? Answer: Its permit requires nutrient reduction. 30 Texas Administrative Code 30.350(f), Classification of Wastewater Treatment Facilities, Wastewater Collection Systems, and Licenses Required
  • Which operator cannot renew a Class D license? Answer: One who operates an activated sludge plant. 30 Texas Administrative Code 30.342(c), Qualifications for License Renewal

Permits

  • A noncompliance that may endanger health was reported by phone within 24 hours. By when is the written report due? Answer: Within five days of becoming aware. 30 Texas Administrative Code 305.125(9)(A), Standard Permit Conditions
  • A permit carries an ammonia-nitrogen limit. In what form is its five-day oxygen demand limit written? Answer: Carbonaceous BOD (CBOD5). 30 Texas Administrative Code 309.1(c), Scope and Applicability
  • A plant is to keep discharging after its permit's expiration date. What must the permittee have done? Answer: Applied for renewal or amendment before the permit expired. 30 Texas Administrative Code 305.125(2), Standard Permit Conditions
  • A spill at a plant may cause pollution. How soon must the person in charge notify the commission? Answer: As soon as possible, and within 24 hours. Texas Water Code 26.039(b), Accidental Discharges and Spills
  • At what share of the permitted average daily flow, held for three consecutive months, must a permittee obtain authorization to begin building more capacity? Answer: 90 percent. 30 Texas Administrative Code 305.126(a), Additional Standard Permit Conditions for Waste Discharge Permits
  • By what day must a monthly effluent report reach TCEQ, unless the permit says otherwise? Answer: The 20th day of the following month. 30 Texas Administrative Code 319.7(d), Documentation of Monitoring Activities
  • Flow has reached 75 percent of the permitted average flow for three months in a row. What must the permittee do? Answer: Begin engineering and financial planning to expand. 30 Texas Administrative Code 305.126(a), Additional Standard Permit Conditions for Waste Discharge Permits
  • When may TCEQ employees enter a permitted plant to inspect it? Answer: At any reasonable time. Texas Water Code 26.014, Power to Enter Property

Design Criteria

  • A plant has a design flow under 1.0 MGD. What is the highest effluent weir loading its clarifier may have at peak flow? Answer: 20,000 gpd per foot of weir. 30 Texas Administrative Code 217.152(d)(4) and (5), Requirements for Clarifiers
  • For how long must a plant's systems for preventing a discharge during a power outage be able to run? Answer: The longest outage of the past 60 months, and at least 20 minutes. 30 Texas Administrative Code 217.36(g), Emergency Power Requirements
  • How accurate must a plant's effluent flow measurement be? Answer: Less than 10 percent error. 30 Texas Administrative Code 217.33(a), Flow Measurement
  • In the Texas design criteria, what does 'peak flow' mean? Answer: The highest two-hour flow expected. 30 Texas Administrative Code 217.2(53), Definitions
  • What does a plant have to put up at its entrance? Answer: A sign with the plant name and a 24-hour contact. 30 Texas Administrative Code 217.40, Signs with Emergency Contact Information
  • What is the minimum chlorine contact time a contact basin must provide under the Texas design criteria? Answer: 20 minutes at peak flow. 30 Texas Administrative Code 217.281(b)(1), Application of Chlorination and Dechlorination Chemicals
  • What is the minimum detention time in a primary clarifier at design flow? Answer: 1.8 hours. 30 Texas Administrative Code 217.129(d)(3)(B), Primary Clarifiers
  • What is the minimum hydraulic detention time of an aerated grit chamber? Answer: 3.0 minutes. 30 Texas Administrative Code 217.125(b)(3), Grit Chambers

Safety

  • An open basin has walls that rise 2 feet above the ground. What must it have? Answer: A railing that reaches 4.0 feet or more above ground. 30 Texas Administrative Code 217.325(b), Railings, Ladders, Walkways, and Stairways
  • How must a non-potable water pipe at a plant be marked? Answer: Painted purple, with a do-not-drink stencil. 30 Texas Administrative Code 217.329(d), Color Coding of Pipes
  • How often must a reduced-pressure backflow assembly on the plant's drinking water connection be tested? Answer: Every year, by a TCEQ-licensed tester. 30 Texas Administrative Code 217.330(b), Drinking Water Supply Connections
  • In the Texas color code for plant piping, what color is a chlorine pipe? Answer: Yellow. 30 Texas Administrative Code 217.329(e), Color Coding of Pipes
  • Where must the exhaust vent of an enclosed chlorine room be placed? Answer: With its bottom no more than one foot above the floor. 30 Texas Administrative Code 217.278(c)(3), Safety Requirements for Gaseous Chlorine Disinfection and Sulfur Dioxide Dechlorination Systems; Pennsylvania DEP wastewater operator training, Module 5, page 3-2
  • Which federal standard do the Texas design criteria say a confined space entry must follow? Answer: 29 CFR 1910.146. 30 Texas Administrative Code 217.333(c), Confined Spaces
  • Which way must the door of a chlorine room open? Answer: To the outside of the building. 30 Texas Administrative Code 217.278(b)(1), Safety Requirements for Gaseous Chlorine Disinfection and Sulfur Dioxide Dechlorination Systems

Laboratory

  • A permit limit is an average and the permit names no way of averaging. Which average is used? Answer: The arithmetic mean. 30 Texas Administrative Code 319.5(f), Required Sampling Location and Frequency of Analysis or Measurement
  • Besides method blanks, laboratory control samples and duplicate analyses, what does the Texas rule name for assuring the quality of measurements? Answer: Matrix spikes. 30 Texas Administrative Code 319.6, Quality Assurance
  • The permit names no sampling point. Where is the effluent sample collected? Answer: Immediately following the last treatment unit. 30 Texas Administrative Code 319.5(a), Required Sampling Location and Frequency of Analysis or Measurement
  • What must a laboratory test meet before its result is submitted to show compliance with the permit? Answer: The accreditation rules of 30 TAC Chapter 25. 30 Texas Administrative Code 319.11(e), Sampling and Laboratory Testing Methods
  • Which federal rule sets the sample containers, holding times and preservation methods a Texas permittee must use? Answer: 40 CFR Part 136. 30 Texas Administrative Code 319.11(b), Sampling and Laboratory Testing Methods

Management

  • A plant cannot be run properly because the permittee refuses to authorize the funds it needs. What does the rule say about the operator's license? Answer: It is not subject to suspension or revocation for that. 30 Texas Administrative Code 30.331(f), Purpose and Applicability
  • A TCEQ inspection is scheduled for next week. Who must be present for it? Answer: The chief operator or the operator in charge. 30 Texas Administrative Code 30.350(l), Classification of Wastewater Treatment Facilities, Wastewater Collection Systems, and Licenses Required
  • In the Texas licensing rules, who is the 'chief operator'? Answer: The licensed operator with overall responsibility. 30 Texas Administrative Code 30.337(1), Definitions
  • Who is responsible for developing the plant's operation and maintenance manual? Answer: The owner of the facility. 30 Texas Administrative Code 217.16(a), Wastewater Treatment Facility Operation and Maintenance Manual
  • Who supervises the plant on site when the chief operator is away? Answer: The operator-in-charge. 30 Texas Administrative Code 30.337(5), Definitions

General Knowledge

  • How does the Texas Water Code define 'sewage'? Answer: Waterborne human waste and waste from domestic activities. Texas Water Code 26.001(7), Definitions
  • Untreated organic matter is discharged to a stream. What does its breakdown do to the water? Answer: It uses up the dissolved oxygen. Pennsylvania DEP wastewater operator training, Module 1: Introduction to Wastewater Treatment (revised 2016), Unit 2, page 2-3
  • Which two nutrients in poorly treated effluent can feed unwanted aquatic growth in the receiving water? Answer: Nitrogen and phosphorus. Pennsylvania DEP wastewater operator training, Module 1: Introduction to Wastewater Treatment (revised 2016), Unit 2, page 2-3
  • Why is effluent disinfected before it reaches a stream that people swim in or drink from? Answer: To inactivate disease-causing organisms. Pennsylvania DEP wastewater operator training, Module 1: Introduction to Wastewater Treatment (revised 2016), Unit 2, page 2-6

Collection

  • How often must collection system operation and maintenance work be supervised and inspected by an on-site licensed operator? Answer: Daily. 30 Texas Administrative Code 30.350(n), Classification of Wastewater Treatment Facilities, Wastewater Collection Systems, and Licenses Required
  • Wastewater that turned septic in the collection system reaches a trickling filter plant. What is the likely result at the plant? Answer: Odors where the flow is spread over the filter. Pennsylvania DEP wastewater operator training, Module 20: Trickling Filters (revised 2016), Unit 2, page 2-14
  • Why are sewers often checked at night for water that should not be in them? Answer: Little water is used then, so leaks stand out. Pennsylvania DEP wastewater operator training, Module 23: Wastewater Collection Systems, Part I, Unit 3, page 3-20
  • Why is a gravity sewer sized to run about half full at peak dry weather flow? Answer: The air space helps hold down corrosive sulfide. Pennsylvania DEP wastewater operator training, Module 23: Wastewater Collection Systems, Part I, Unit 2, page 2-8

Pumping

  • A lift station pumps straight into a plant that has no flow equalization. What limit does the rule set on its peak pump capacity? Answer: Equal to or less than the peak flow. 30 Texas Administrative Code 217.61(e)(1), Lift Station Pumps
  • The water-lubricated packing gland on a pump shows slight seepage. What does that mean? Answer: It is normal: the water cools and flushes the packing. Pennsylvania DEP wastewater operator training, Module 11: Maintenance, Unit 4, page 4-6
  • What is the 'firm pumping capacity' of a lift station? Answer: The most it can pump with its largest pump out of service. 30 Texas Administrative Code 217.2(33), Definitions
  • What size solid must a raw wastewater pump, other than a grinder pump, be able to pass? Answer: A sphere 2.5 inches across. 30 Texas Administrative Code 217.61(a), Lift Station Pumps
  • Where may the gate valves and check valves of a lift station be placed? Answer: In a valve vault by the wet well, or in a dry well. 30 Texas Administrative Code 217.60(b)(5) and (6), Lift Station, Wet Well, and Dry Well Designs
  • Which impeller suits a centrifugal pump that moves liquid carrying solids? Answer: An open impeller, which is less prone to clogging. Pennsylvania DEP wastewater operator training, Module 11: Maintenance, Unit 4, page 4-2

Preliminary Treatment

  • What clear opening between bars does the rule set for a manually cleaned coarse screen? Answer: 0.5 inch to 1.0 inch. 30 Texas Administrative Code 217.121(e)(1), Coarse Screens
  • What dissolved oxygen level must the aeration system of a flow equalization basin be sized to hold? Answer: At least 1.0 mg/L. 30 Texas Administrative Code 217.128(c), Flow Equalization Basins
  • What velocity must wastewater keep through a coarse screen at design flow? Answer: 1.0 to 3.0 feet per second. 30 Texas Administrative Code 217.121(f)(1), Coarse Screens
  • When may a plant go without a coarse screen? Answer: When all flow passes through a grinder pump or grinding device. 30 Texas Administrative Code 217.121(a), Coarse Screens
  • Which plants must have a grit removal system under the Texas design criteria? Answer: Plants that use anaerobic digestion. 30 Texas Administrative Code 217.124(a), Grit Removal Systems

Primary Treatment

  • In an Imhoff tank, where do the solids that settle in the upper compartment go? Answer: Through a slot into the digestion compartment below. 30 Texas Administrative Code 217.204(a)(3), Imhoff Tanks
  • What is the most BOD5 removal a primary clarifier design may count on without a pilot study or full-scale data? Answer: 35 percent. 30 Texas Administrative Code 217.129(i), Primary Clarifiers
  • What surface loading rate may a primary clarifier not exceed at design flow? Answer: 1,000 gpd per square foot. 30 Texas Administrative Code 217.129(d)(3)(A), Primary Clarifiers
  • Where must scum from a primary clarifier go, unless TCEQ approves another method in writing? Answer: To a sludge digester. 30 Texas Administrative Code 217.129(b), Primary Clarifiers

Ponds

  • A stabilization pond system has no chlorination. What total retention time in its free-water-surface ponds lets it go without chemical disinfection, unless the permit says otherwise? Answer: At least 21 days. 30 Texas Administrative Code 309.3(g)(5), Application of Effluent Sets
  • At what time of day is low dissolved oxygen most common in a pond? Answer: Early in the morning. Pennsylvania DEP wastewater operator training, Module 19: Treatment Ponds and Lagoons, Unit 1, page 1-10
  • How close to the nearest property line may a lagoon with zones of anaerobic activity be built, under the buffer zone rule? Answer: No closer than 500 feet. 30 Texas Administrative Code 309.13(e)(1), Unsuitable Site Characteristics
  • How deep must the deeper part of a facultative lagoon be near the inlets, where sludge is stored and treated without oxygen? Answer: At least 12 feet. 30 Texas Administrative Code 217.205(b), Facultative Lagoons
  • Why are emergent weeds at the edge of a pond removed? Answer: They shelter mosquitoes, and their roots can make leaks. Pennsylvania DEP wastewater operator training, Module 19: Treatment Ponds and Lagoons, Unit 2, page 2-18

Trickling Filters and RBC Units

  • The biomass on an RBC turns white. What does that point to? Answer: Organic overloading and low dissolved oxygen. Pennsylvania DEP wastewater operator training, Module 21: Rotating Biological Contactors (revised 2016), Unit 2, page 2-5
  • How much soluble BOD5 does a 'roughing' trickling filter remove, by the rule's classes? Answer: 50 to 75 percent. 30 Texas Administrative Code 217.182(b)(1), Trickling Filters-General Requirements
  • How much ventilation must the cover over a rotating biological contactor provide? Answer: At least six complete air exchanges per hour. 30 Texas Administrative Code 217.185(b)(1), Rotating Biological Contactors
  • Part of a trickling filter is ponding. Which response helps flush it? Answer: Increase the recirculation rate. Pennsylvania DEP wastewater operator training, Module 20: Trickling Filters (revised 2016), Unit 2, page 2-13
  • What must come before a rock media trickling filter? Answer: A primary clarifier with scum and grease removal. 30 Texas Administrative Code 217.182(d)(2), Trickling Filters-General Requirements
  • Which condition lets filter flies breed on a trickling filter? Answer: Media that alternates between wet and dry. Pennsylvania DEP wastewater operator training, Module 20: Trickling Filters (revised 2016), Unit 2, page 2-15

Activated Sludge

  • Clumps of sludge float to the surface of a secondary clarifier with gas bubbles attached. What is happening? Answer: Nitrate is turning into nitrogen gas in the clarifier. Pennsylvania DEP wastewater operator training, Module 16: The Activated Sludge Process, Part II (revised October 2014), Unit 1, page 1-10
  • Filamentous organisms have made a plant's activated sludge bulk. How do they keep it from settling? Answer: They bridge the flocs, so the sludge stays loose. Pennsylvania DEP wastewater operator training, Module 16: The Activated Sludge Process, Part II (revised October 2014), Unit 2, page 2-3
  • How does an operator control the solids retention time in the aeration tanks? Answer: By wasting a measured volume of sludge. 30 Texas Administrative Code 217.159(a)(1), Process Control
  • Nocardia foam covers the aeration tank. Which change helps bring it under control? Answer: Shorten the MCRT. Pennsylvania DEP wastewater operator training, Module 16: The Activated Sludge Process, Part II (revised October 2014), Unit 2, page 2-7
  • What is a drawback of running an activated sludge plant in the high rate mode? Answer: Higher BOD and suspended solids in the effluent. Pennsylvania DEP wastewater operator training, Module 15: The Activated Sludge Process, Part 1 (revised July 2014), Unit 1, page 1-11
  • Which set of features describes a conventional activated sludge plant? Answer: F/M of 0.2 to 0.4 and 6 to 8 hours of retention. Pennsylvania DEP wastewater operator training, Module 15: The Activated Sludge Process, Part 1 (revised July 2014), Unit 1, page 1-12

Process Control

  • What can a return activated sludge pumping rate that is too low cause? Answer: A rising sludge blanket in the secondary clarifier. Pennsylvania DEP wastewater operator training, Module 16: The Activated Sludge Process, Part II (revised October 2014), Unit 1, page 1-10
  • What does the sample daily activity report in a plant's operation and maintenance manual document? Answer: Internal process control monitoring. 30 Texas Administrative Code 217.16(b)(1)(I), Wastewater Treatment Facility Operation and Maintenance Manual
  • What goes wrong when the F/M ratio of an activated sludge system is too high? Answer: The bacteria do not form a good floc. Pennsylvania DEP wastewater operator training, Module 16: The Activated Sludge Process, Part II (revised October 2014), Unit 1, page 1-20
  • White, crisp foam appears on the aeration tank. Which change does it call for? Answer: Decrease the sludge wasting rate. Pennsylvania DEP wastewater operator training, Module 16: The Activated Sludge Process, Part II (revised October 2014), Unit 1, page 1-6
  • Why do operators often use COD in place of BOD when they work out the F/M ratio? Answer: COD results are ready about four hours after sampling. Pennsylvania DEP wastewater operator training, Module 16: The Activated Sludge Process, Part II (revised October 2014), Unit 1, page 1-20
  • Why is another plant's sludge volume index (SVI) a poor target for your own plant? Answer: SVI depends on your own sludge and MLSS. Pennsylvania DEP wastewater operator training, Module 16: The Activated Sludge Process, Part II (revised October 2014), Unit 1, page 1-22

Disinfection

  • A sodium hypochlorite tank stands outdoors. What must be true of the tank? Answer: It must be opaque or otherwise block sunlight. 30 Texas Administrative Code 217.280(d)(2)(A), Design of Sodium Hypochlorite Disinfection and Sodium Bisulfite Dechlorination Systems
  • The chlorine dose stays the same while the chlorine demand of the effluent rises. What happens to the residual? Answer: It falls. Pennsylvania DEP wastewater operator training, Module 5: Disinfection and Chlorination (revised 2016), Unit 1, page 1-9
  • How many chlorine cylinders must a gas chlorination system include? Answer: Those needed at peak flow, plus at least one more. 30 Texas Administrative Code 217.271(a) and (b), Gaseous Chlorine Disinfection and Sulfur Dioxide Dechlorination System Redundancy Requirements
  • Under the Texas effluent rule, the chlorine residual in mg/L multiplied by the detention time in minutes must reach at least what figure? Answer: 20. 30 Texas Administrative Code 309.3(g)(2), Application of Effluent Sets
  • What does the rule say about heating blankets on chlorine gas cylinders? Answer: They are prohibited. 30 Texas Administrative Code 217.273(a)(1)(B), Cylinder Requirements for Gaseous Chlorine Disinfection and Sulfur Dioxide Dechlorination Systems
  • What forms when chlorine combines with the ammonia in wastewater? Answer: Chloramines. Pennsylvania DEP wastewater operator training, Module 5: Disinfection and Chlorination (revised 2016), Unit 1, page 1-8
  • What minimum contact time must a dechlorination system provide at peak flow? Answer: 20 seconds. 30 Texas Administrative Code 217.281(c)(2), Application of Chlorination and Dechlorination Chemicals
  • Where chlorination is used, what is the highest chlorine residual the rule allows in any discharge? Answer: 4 mg/L on a grab sample. 30 Texas Administrative Code 309.3(g)(2), Application of Effluent Sets
  • Which indicator bacteria does a plant measure when it discharges to fresh water? Answer: E. coli. 30 Texas Administrative Code 309.3(h)(1), Application of Effluent Sets

Sludge Digestion

  • Anaerobically digested sludge is going to a landfill. At least how long must it be digested in the primary digester? Answer: 15 days. 30 Texas Administrative Code 217.249(j)(4), Sludge Stabilization
  • In what temperature range should a mesophilic anaerobic digester be held? Answer: 90 to 100 °F. Pennsylvania DEP wastewater operator training, Module 6: Solids Handling and Disposal, Unit 2, page 2-19
  • What does the rule say about an anaerobic digester that has no cover? Answer: It is prohibited. 30 Texas Administrative Code 217.249(s)(1), Sludge Stabilization
  • Which bacteria in an anaerobic digester are the less tolerant of changes in temperature and pH? Answer: The methane formers. Pennsylvania DEP wastewater operator training, Module 6: Solids Handling and Disposal, Unit 2, page 2-4 and 2-5
  • Which is true of aerobic digestion, set beside anaerobic digestion? Answer: It produces fewer odors. Pennsylvania DEP wastewater operator training, Module 6: Solids Handling and Disposal, Unit 3, page 3-2
  • Which test gives the first warning that an anaerobic digester is in trouble? Answer: The volatile acids to alkalinity ratio. Pennsylvania DEP wastewater operator training, Module 6: Solids Handling and Disposal, Unit 2, page 2-19

Biosolids Disposal

  • By how much must the mass of volatile solids be reduced to meet the first vector attraction reduction alternative? Answer: At least 38 percent. 30 Texas Administrative Code 312.83(b)(1), Vector Attraction Reduction
  • Dewatered solids have a solids content under 35 percent. For how long may they be stored at the plant? Answer: No more than seven days. 30 Texas Administrative Code 217.251(e)(2), Sludge Storage
  • For how long must monitoring records of sewage sludge use and disposal be kept? Answer: At least five years. 30 Texas Administrative Code 305.125(11)(B), Standard Permit Conditions
  • Where in Texas must a plant use some dewatering method other than sludge drying beds? Answer: Where rain averages 45 inches a year or more, or humidity 50 percent. 30 Texas Administrative Code 217.250(e), Sludge Dewatering
  • Which sludge does a gravity thickener handle well? Answer: Primary sludge. Pennsylvania DEP wastewater operator training, Module 6: Solids Handling and Disposal, Unit 1, page 1-9

Effluent Disposal

  • A permit sets a minimum dissolved oxygen level for the effluent. What must the plant be able to add after disinfection? Answer: Post-aeration. 30 Texas Administrative Code 217.283(b), Post-Disinfection Requirements
  • Effluent goes to an evaporation pond. What is the highest BOD5 the rule allows on a grab sample? Answer: 100 mg/L. 30 Texas Administrative Code 309.3(e), Application of Effluent Sets
  • How often must the flow to a land application site be monitored? Answer: Daily. 30 Texas Administrative Code 319.5(d), Required Sampling Location and Frequency of Analysis or Measurement
  • Reclaimed water irrigates a public park while people may be present. Which type of reclaimed water use is this? Answer: Type I. 30 Texas Administrative Code 210.32(1), Specific Uses of Reclaimed Water
  • Treated effluent is applied to land that the public can enter. What does the rule require? Answer: The effluent must be disinfected. 30 Texas Administrative Code 309.3(g)(4), Application of Effluent Sets

Math Problems

  • A circular primary clarifier is 40 feet across, with a side water depth of 10 feet. The flow is 1.0 MGD. What is the detention time? Answer: About 2.3 hours. Worked arithmetic; formula in Pennsylvania DEP operator training, Module 28: Basic Math, page 2-13
  • A circular secondary clarifier is 50 feet across, with a weir around its whole edge. Peak flow is 1.5 MGD. What is the weir loading? Answer: About 9,550 gpd per foot. Worked arithmetic; weir loading in Pennsylvania DEP operator training, Module 28: Basic Math, pages 2-9 and 2-10
  • A facultative lagoon has a surface area of 4 acres. It receives 0.2 MGD at a BOD5 of 200 mg/L. What is its organic loading? Answer: About 83 pounds of BOD5 per acre per day. Worked arithmetic; the limit of 150 pounds per acre per day is from 30 Texas Administrative Code 217.205(c)
  • A wet well is 8 feet across. With the inflow shut off, one pump lowers the level 3 feet in 5 minutes. What is the pumping rate? Answer: About 225 gpm. Worked arithmetic; formula in Pennsylvania DEP operator training, Module 28: Basic Math, page 2-13
  • An aeration tank holds 0.25 million gallons at an MLSS of 2,500 mg/L. Each day 400 pounds of solids are wasted and 34 pounds leave in the effluent. What is the MCRT? Answer: About 12 days. Pennsylvania DEP wastewater operator training, Module 16: The Activated Sludge Process, Part II (revised October 2014), Unit 1, page 1-18
  • The chlorine residual to be removed is 2.0 mg/L in a flow of 0.8 MGD. Each pound of chlorine takes 1.465 pounds of sodium bisulfite. How much sodium bisulfite is needed per day? Answer: About 19.5 pounds. Worked arithmetic; the 1.465 pounds is from 30 Texas Administrative Code 217.280(b)(2)(B)
  • Flow to the aeration tank is 0.4 MGD with a BOD of 180 mg/L. The tank holds 0.3 million gallons at an MLVSS of 2,000 mg/L. What is the F/M ratio? Answer: 0.12. Pennsylvania DEP wastewater operator training, Module 16: The Activated Sludge Process, Part II (revised October 2014), Unit 1, page 1-20
  • Mixed liquor settles to 240 mL in a 1,000 mL cylinder after 30 minutes. The MLSS is 2,400 mg/L. What is the SVI? Answer: 100 mL/g. Pennsylvania DEP wastewater operator training, Module 16: The Activated Sludge Process, Part II (revised October 2014), Unit 1, page 1-22
  • Peak flow is 1.44 MGD. What volume must the chlorine contact basin hold to give 20 minutes of contact at peak flow? Answer: 20,000 gallons. Worked arithmetic; the 20 minutes is from 30 Texas Administrative Code 217.281(b)(1)

How this list was compiled: Our own questions, in the 20 subject categories of TCEQ's need-to-know criteria for the Class C Wastewater Treatment Plant Operator exam (tceq.texas.gov). Texas rules were read in 30 Texas Administrative Code Chapters 30, 210, 217, 305, 309, 312 and 319 (a public copy at law.cornell.edu) and in Texas Water Code Chapter 26 (statutes.capitol.texas.gov); plant operation in the Wastewater Operator Certification Training workbooks of the Pennsylvania Department of Environmental Protection (files.dep.state.pa.us). All read October 16, 2026 and again November 27, 2026. Each question names the section or page it was written from. Licence: Every question, answer choice and explanation was written for this site from the public sources named on it. Nothing is taken from the exam, from a study guide or course manual, from the training workbooks' own exercises, or from another practice test.

How it works

This TCEQ wastewater C practice test follows the 20 subject categories of the need-to-know criteria for the Class C Wastewater Treatment Plant Operator exam. It is unofficial and not affiliated with the Texas Commission on Environmental Quality.

Read the full guide

Class C builds on Class D

TCEQ asks a Class C operator to know everything listed for Class D as well. Where Class D asks what a unit is for, Class C asks how it runs and how it is maintained, and the math grows to two or three steps.

Where the answers come from

Ninety of the 126 questions rest on Texas law or a TCEQ page: the licensing rules of 30 TAC Chapter 30, the permit and monitoring rules, the Chapter 217 design criteria and the Water Code. How a plant runs is the same in any state, so the operating questions cite the Pennsylvania DEP's public operator training modules by page.

  • Keep the 20s apart: 20 minutes of chlorine contact at peak flow, 20 seconds for dechlorination, monthly reports due by the 20th.
  • Learn the flow triggers together: 75 percent of permitted flow for three months means planning, 90 percent means authorization to build.
  • Pounds per day = flow in MGD x mg/L x 8.34. Loading, dosage, F/M and MCRT problems all start there.

Questions and answers

How many questions are on the TCEQ Class C wastewater exam?

TCEQ's exam pages give no count, so this page does not guess one. The need-to-know criteria name the subjects, not how many questions each one gets.

What should I study for the Class C wastewater test in Texas?

TCEQ names three things: the training manuals of the required courses, the rules that license wastewater personnel, and the rules for operating treatment and collection systems. Its need-to-know page says what a Class C operator should know in each category.

Who can take the TCEQ wastewater C exam?

An applicant with a high school diploma or GED, two years of work experience and three courses: Basic Wastewater Operation, Activated Sludge or Wastewater Treatment, and one elective. Up to one year of experience can be replaced by college hours or extra approved training.

What can a Class C wastewater operator run in Texas?

As chief operator: an activated sludge plant permitted up to 1.0 MGD, a trickling filter or RBC plant up to 2.0 MGD, and pond or no-discharge systems of any flow. TCEQ can raise a plant's category for unusually complex processes.

What happens if I fail the TCEQ wastewater exam?

You may test again once you have your result, and some testing centers offer one retest the same day. The application ends 365 days after its date or after four failures of the same exam, whichever comes first.